Community
- Details
- Written by: Editor
The meeting will begin at 10:30 a.m. at the Catholic Charities of Lake County facility, located at 21257 Calistoga St.
- Details
- Written by: Lake County News Reports
The shop will be open Saturday, Dec. 5, and Saturday, Dec. 12, from 10 a.m. to 2 p.m., at St. John’s Episcopal Church, 1190 N. Forbes St., Lakeport.
Regular, ongoing thrift shop hours are Tues, Wednesday, and Thursdays, 10 a.m. to 4 p.m.
For more information, call (707) 263-4785.
- Details
- Written by: Editor
NORTH COAST – Caltrans reports that the following road projects will be taking place around Lake County during the coming week.
Included are Mendocino County projects that may impact Lake County commuters.
LAKE COUNTY
Highway 20
– Caltrans will perform routine maintenance from Gravel Plant Road to the Colusa/Lake County line beginning Monday, Nov. 30. Work hours are 8 a.m. to 3:30 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays.
Highway 175
– Nancy Kayman of Lakeport has been granted a Caltrans Encroachment Permit to install a driveway near Forestry Station Access Road. Work hours are 8 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
MENDOCINO COUNTY
Highway 1
– Pavement repair 0.2 mile north of Big Gulch Road will begin Monday, Nov. 30. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays. Contractor – Rege Construction Inc. of Cloverdale.
– Construction of a retaining wall about three miles north of Elk will continue. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should
anticipate 10-minute delays. Contractor – Granite Construction of Ukiah.
Highway 20
– Construction of a retaining wall 0.4 mile east of Three Chop Road will continue. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate five-minute delays. Contractor – Granite Construction of Ukiah.
Highway 101
– Bridge deck repairs at the Cummings Road Bridge will continue. Work hours are 7 a.m. to 7 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – DeBruin Construction Inc. of French Camp.
Highway 128
– AT&T of Walnut Creek has been granted a Caltrans Encroachment Permit for utility relocation from 1.5 to 3.5 miles east of Mountain House Road. Work hours 8 a.m. to 4 p.m., weekdays. One-way traffic
control will be in effect. Motorists should anticipate five-minute delays.
Highway 162
– A highway reconstruction and realignment project 1.6 miles east of Rodeo Creek Bridge will continue on Wednesday, Dec. 2. Work hours are 8 a.m. to 4 p.m. One-way traffic control will be in effect. Motorists should anticipate five-minute delays. Contractor – Argonaut Constructors of Santa Rosa.
– PG&E of Eureka has been granted a Caltrans Encroachment Permit for an aerial crossing 0.5 mile east of East Lane on Thursday, Dec. 3. Work hours are 9 a.m. to 3 p.m. Intermittent full road closures
will be in effect. Motorists should anticipate five-minute delays.
For information pertaining to emergency roadwork or for updates to scheduled roadwork, please contact the California Highway Information Network (CHIN) at 1-800-GAS-ROAD (1-800-427-7623).
- Details
- Written by: Dorothy De Lope
The ceremony will take place at Zino's Ristorante, 6330 Soda Bay Road, Kelseyville.
Prior to the ceremony, the regular monthly meeting will be from 9:30 a.m. to 11:30 a.m.
Lunch will be served at noon and will be followed by the ceremony.
Reservations for the lunch are necessary. The cost is $25 per person.
Anyone interested in attending the meeting and ceremony, please call the Flotilla information line at 707-513-5122.
How to resolve AdBlock issue?