The public is invited to attend the completion celebration, scheduled to take place from 1 p.m. to 2 p.m. at Brutacao Schoolhouse Plaza, Bliss Banquet Room, 13500 South Highway 101, Hopland.
Key speakers will include Charles C. Fielder, Caltrans District 1 director; Alan Escarda, Caltrans construction engineer; and J. David Colfax, Mendocino County Board of Supervisors.
A traffic signal could have been used for this safety project, but a roundabout has numerous advantages at this location, which include:
• A smaller footprint than a signalized intersection with left-turn lanes, so less new right-of-way was required.
• Providing traffic calming, resulting in reduced speeds.
• Requiring less maintenance, lower yearly operational costs, and a longer service life.
• Providing a safe place for large trucks to safely turn around.
• Enhancing the roundabout with landscaping will create an aesthetic gateway to the community.
For more information on the advantages of roundabouts, and how to navigate them, see www.dot.ca.gov/dist1/d1projects/roundabout.htm.
{mos_sb_discuss:2}