Thursday, 03 October 2024

Caltrans plans major roadwork through Thursday, Sept. 2

NORTH COAST – Caltrans reports that the following road projects will be taking place around Lake County during the coming week.


Included are Mendocino County projects that may impact Lake County commuters.


LAKE COUNTY


Highway 20


– AT&T of Sacramento has been granted a Caltrans Encroachment Permit for utility maintenance near Government Street on Monday, Aug. 30, and Tuesday, Aug. 31. Work hours are 8 a.m. to 3 p.m. Intermittent full road closures will be in effect. Motorists should anticipate 10-minute delays.


– PG&E of Ukiah has been granted a Caltrans Encroachment Permit for utility repairs between 13th Street and 14th Street on Monday, Aug. 30, and Tuesday, Aug. 31. Work hours are 8 a.m. to 3 p.m. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns.


– Gerald Underwood of Sebastopol has been granted a Caltrans Encroachment Permit for an aerial crossing 0.2 mile east of Linden Street on Wednesday, Sept. 1. Work hours are 9 a.m. to 10 a.m. Intermittent full road closures will be in effect. Motorists should anticipate 10-minute delays.


MENDOCINO COUNTY


Highway 1


– Installation of a radar feedback sign near Philo Greenwood Road will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays. Contractor – Mike Brown Electric of Cotati.


– California Department of Parks and Recreation has been granted a Caltrans Encroachment Permit for sewer line repairs 0.3 mile south of Larkin Road beginning Monday, August 30. Work hours are 9 a.m. to 3 p.m., weekdays. Intermittent one-way traffic control will be in effect. Motorists should anticipate 10-minute delays.


Highway 20


– Comcast of Ukiah has been granted a Caltrans Encroachment Permit for an aerial crossing 0.1 mile east of Noyo Acres Drive on Monday, Aug. 30. Work hours are 11 a.m. to 11:30 a.m. Intermittent full road closures will be in effect. Motorists should anticipate five-minute delays.


Highway 101


– A metal be a.m. guardrail repair project at various locations from 0.1 mile north of the Mendocino/Sonoma County line to 0.3 mile south of the Haehl Overhead Bridge will continue. Work hours are 6 a.m. to 6 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Wahlund Construction of Eureka.


– A metal be a.m. guardrail repair project from Mill Company Road to 0.6 mile north of Carpenter Lane will continue. Nighttime work hours are 7 p.m. to 7 a.m., Sunday evening through Friday morning. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Wahlund Construction of Eureka.


– A pavement repair project from the Robinson Creek Overcrossing to the Forsyth Creek Bridge will continue. Work hours are 5 a.m. to 4 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Granite Construction, Incorporated, of Ukiah.


– Installation of rock slope protection from Reeves Canyon Road to Black Bart Drive will continue. Work hours are 7 a.m. to 4 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Granite Construction, Incorporated, of Ukiah.


Highway 162


– Storm damage repair east of Sand Bank Creek will continue. Work hours are 7 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays. Contractor – Granite Construction of Ukiah.


Highway 222


– Replacement of the Russian River Bridge will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate 15-minute delays during work hours and five-minute delays at other times. Contractor – CC Myers of Rancho Cordova.


Highway 271


– Culvert repair near Piercy will begin Monday, Aug. 30. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Van Meter Logging Inc. of Garberville.


For information pertaining to emergency roadwork or for updates to scheduled roadwork, please contact the California Highway Information Network (CHIN) at 1-800-GAS-ROAD (1-800-427-7623).

Upcoming Calendar

14Oct
14Oct
10.14.2024
Columbus Day
31Oct
10.31.2024
Halloween
3Nov
11Nov
11.11.2024
Veterans Day
28Nov
11.28.2024
Thanksgiving Day
29Nov
24Dec
12.24.2024
Christmas Eve

Mini Calendar

loader

LCNews

Award winning journalism on the shores of Clear Lake. 

 

Newsletter

Enter your email here to make sure you get the daily headlines.

You'll receive one daily headline email and breaking news alerts.
No spam.
Cookies!

lakeconews.com uses cookies for statistical information and to improve the site.

// Infolinks